30 WASHBURN

FREETOWN, MA
2.8 MW | GLIDE AGILE

This 2.8 MW project utilized the Terrasmart GLIDE Agile racking in portrait orientation.

The site had many rocks and difficult subsurface conditions along with undulating terrain. By partnering with us, the client (Borrego) was able to minimize grading. The site was designed to 125MPH wind loads with a 30PSF snow load. The client used 7,794 JA Solar 360 Watt Solar Panels.

We supplied 1,862 Ground Screws (2100MM) and performed rock drilling on the site to create pilot holes for the ground screws.

DESIGN SPECIFICATIONS

0.0

OF SOLAR INSTALLED

00

GROUND SNOW LOAD

000

WIND LOAD

0000

GROUND SCREWS